Qingdao Laoshan Subitis Salutem Centrum Project-Lida Group

Mense Martio 2022, in facie gravi COVID-19 tumultus in Qingdao, Laoshan Health Centre primo tempore operandi est.Lida Group et Sinarum Construction Engineering Group Co., LTD.Constructio centri sanitatis cum area totali area 28000 metrorum quadratorum et 1,617 vasorum domorum subitis tempore brevissimo perficietur.

Nomen Project: Qingdao Laoshan Health Center Project

Customer Name: China Constructio Octo Engineering Bureau

Project Oratio: Qingdao urbem

Productum uti: Flatpack continens domuum

 

De Lida

Lida Group anno 1993 instituta est, ut opificem professionalem et exportatorem quae ad consilium, productionem, institutionem et mercaturam fabricandi pertinet.

Lida Group consecutus est ISO9001, ISO14001, ISO45001, EU CE certificatio (EN1090) et SGS, TUV et BV inspectionem obduxit.Lida Group consecutus est II Classis Qualificatio Steel Structurae Professional Construction Contracting and General Contracting Qualification of Construction Engineering.

 

Lida Societas una ex potissimis societatibus societatibus integratis aedificandis in Sinis est.Lida Group membrum plurium consociationum factae sunt sicut Consociationis Structurae Sinarum, Consilium Sinarum ad Promotionem Internationalis Commercii et Sinae Aedificii Consociationis Metalli Structurae, etc.

 

Summa res Lida Group continent magna-scalaelabor castra,Ferro structuram aedificia, LGS Villa, continens domus, Prefab domus, et alia aedificia integra.Donec nunc fructus nostri ad plus quam 145 terras et regiones exportati sunt.


Post tempus: Apr-26-2023